Backlog Legacy Adoptions

We support house builders and developers
clear schemes blocked from adoption
due to outstanding remedial work

How DSS Group supports house builders

Based on the information to hand and site visits, DSS develop a costed plan for the House Builder which sees us take control of the discussions and negotiations with all stakeholders.

We offer the following:

  • Single contractor for all site works using in-house employees
  • Project Management aimed at “right first time” and “on time”
  • DSS can act as either Main Contractor or Principle Contractor, taking responsibility for H&S at all stages
  • Expertise in adoption agreements and works
  • Management and coordination of all stakeholders
  • Communications with all parties throughout the project

Our services include:

Review and survey

Review of all documents and agreements in place to establish a costed plan with timetables. Our initial review will list all non-compliances known at the time followed up with a detailed survey of the state of the roads, drainage, public open spaces and other areas.

Communication

DSS actively engage with all stakeholders from residents through local authorities, water and utility companies, telecoms, developers and any third parties involved in the adoption and release of bonds process.

Residents are the key to a smooth project. Very often they are the most affected – paying full Council Taxes and Water Company Bills and not receiving the services they expect to get. In some cases they may also be being asked to pay management fees to cover works which would normally be covered by the adopting entity.

Consultancy

DSS will either work from existing drainage and estate condition reports or produce our own. Uniquely we have the in-house capability for drainage surveys, MH condition reports and detailed road, kerb, footpath, streetlighting, signage and hard landscaping reports.

Based on the review phase we create a detailed list of non-compliances which we then agree with the adopting body. Following acceptance we carry the works out ourselves, increasing control and speed. The experience of our management team ensures that all works are carried out to adoptable standards.

Negotiation

DSS lead the negotiation to secure adoption and Bond release by constant liaison with the Local Authorities and Water Companies.

Our clear objective is to achieve adoption and hence Bond release in a time and cost effective manner. The key is continued communication with everyone involved plus a skilled work force.

KEY SERVICES

Every project managed by DSS
goes through standard key phases

Phase 1

Review Phase

This is a combination of office and site based research where we review the information at hand. We then verify this with initial review meetings with the local authority and water companies.

The collated information is then turned into a report which includes a detailed summary of the work to be completed, associated costs and a rough cut timetable.

You will not incur any cost at this point. Costs only accrue when you have appointed DSS to manage the adoption process on the estate.

Phase 2

Planning Phase

DSS will carry out site specific research which will include a new CCTV drainage survey if none currently exists, the creation of a S38 adoption plan, and a review of the estate wide GPS data identifying locations for SuDS, POS and Easement Areas.

On completion of this phase you will be presented with a detailed and fully costed report which will have been given tacit approval by the Local Authorities and Water Companies. We will not start any work which we don’t expect to move you closer to having the estate adopted.

The work in this phase will include:

  • Liaison with the adopting authorities to agree a “to-do list”
  • Complete and record a visual inspection of the roads and footpaths which will be shared with the Local Authority to ensure they don’t have any unseen issues.
  • Carry out CCTV surveys of the drainage and gully network, which will result in a remedials list and eventually the as-built survey for the Water Company.
  • Complete an engineering survey of the physical estate which will be compared to the agreed design in the various planning consent documents. This will confirm the estate has been built to the agreed design or generate a list of non-compliances which need to be resolved.
  • Review all technical and legal requirements

Phase 3

Adoption Remedials Phase

This phase depends upon the To-Do List created during the Planning Phase and could potentially include:

  • Manhole remedials
  • Patches or Liners installed in drain runs
  • Dig down repairs to damaged sections
  • SuDS work – pond and ditch work
  • Addressing problems with Pumping Stations, Flood Attenuation Systems, and Outfalls
  • Roads, footpaths and communal area remedials and final surfacing
  • Street lighting works
  • Service diversions and utility works

Phase 4

Delivery Phase

DSS will have engaged with the adopting bodies throughout the Adoption Remedials Phase to ensure the works were to an adoptable standard.

When the works are complete DSS will then work with these bodies to ensure the drains and roads are passed over into the “maintenance phase” which should then release at least a proportion of the Bonds.

This phase is where our experienced management team prove their worth:

  • ‍Co-ordinating site visits with the adopting authorities to achieve sign-off for remedial works
  • Preparation of Completion Pack with detailed reports and surveys
  • Written acceptance of adopting authorities for them taking over responsibility (CDM, O&M, PS Manuals etc) to include obtaining maintenance and/or adoption certificates
  • H&S Review
  • Confirmation of Easements

House builders we work with

About DSS

The DSS Group of companies has the in-house skills to review and understand the issues preventing adoption, to survey both the drainage system and hard landscapes, and to carry out remedials to both drains, SuDS, roads, footpaths, Public Open Spaces and Easement Areas.

DSS currently work with a number of major House Builders. We have also invested heavily in systems for data capture and reporting. Our senior management team have a combined 80 years in managing the delivery of drainage and civil engineering projects.

We operate an easy to understand fee structure with clear quotations for any remedial works required. From instruction to adoption we manage the whole process, reporting regularly, but removing the time drag in resolving what can be complex issues.

Enquiry Form

Contact our specialist adoption team today to discuss your project further

Locations

Head Office:
Centrix @ Keys
Hednesford
Cannock
WS12 2HA

Barracks Road
Sandy Lane Industrial Estate
Stourport-on- Severn
DY13 9QB